Glazing and aluminium systems combine brittle glass, flexible seals, metal framing, anchors and building movement. Safety, edge clearances, drainage, structural deflection, thermal movement and hardware loads must be resolved as a system.

40 technical visuals6 execution stages27 technical chaptersQA/QC + failures + maintenance
Glass & Aluminium technical hero
GUIDE MAP

Read the discipline visually, then go into the engineering detail.

Every image below is activity-specific. No repeated generic placeholder sheets are used in this guide.

01 · SYSTEM OVERVIEW

What this activity is

Glass & Aluminium overview drawing

What this activity is

Glass and aluminium systems combine brittle glass panels with metal framing / hardware. Safety depends on selecting the correct glass type and support system, controlling edge clearances, allowing movement and using compatible gaskets / sealants.

What to expect

Expect glass dimensions to be finalized only after verified openings / shop drawings. Glass type, thickness, heat treatment, lamination, edge finish, holes and hardware must be confirmed before manufacture because many operations cannot be corrected after tempering.

01Verify openings and supporting substrate before fabrication
02Select glass type/thickness from safety and structural criteria
03Detail setting blocks, edge clearances, gaskets/sealants and drainage
04Coordinate anchors and perimeter movement
05Protect glass edges throughout transport/installation
06Adjust doors/hardware and water/air test where specified
02 · ENGINEERING FUNDAMENTALS

Understand why the system behaves the way it does.

01

Glass design depends on panel size/aspect ratio, support condition and design pressure; use the selected manufacturer/engineer calculation

02

Thermal movement ΔL = α × L × ΔT for aluminium and other materials; perimeter joints must accommodate movement

03

Sealant joint geometry and adhesion surfaces must follow the selected sealant manufacturer’s design

Glass & Aluminium engineering fundamentals
01

Tempered and laminated glass solve different risks. Tempering changes breakage behaviour and strength; lamination retains fragments/interlayers and can provide post-breakage retention depending on build-up.

02

Do not rigidly trap glass edges. Setting blocks and clearances transfer weight correctly and allow frame/glass movement without edge contact.

03

Façade/shopfront water performance depends on pressure equalisation, drainage paths, seals and interfaces; cosmetic sealant over a poor drainage design is not a durable fix.

03 · EXECUTION WORKFLOW

Six progressive stages from preparation to verified handover.

Open any plate to read the full-resolution technical notes.

Survey Shopdrawings technical drawing
STAGE 01

Survey Shopdrawings

Measure finished structural / architectural opening and datum

Engineering intent

Annealed, heat-strengthened, tempered or laminated selected by risk and design

Inspection / hold point

Glass make-up and thickness match approved shop drawings

Best practice

Never site-modify tempered glass

Failure to avoid

Ordering glass before final opening verification

Handover / maintenance

Clean with non-abrasive products suitable for coatings

Fabrication technical drawing
STAGE 02

Fabrication

Confirm glass make-up, panel sizes, joints, hardware, frame and interfaces

Engineering intent

Based on panel size, support, load and hardware system—not appearance

Inspection / hold point

Edges / holes / cut-outs are correct and undamaged

Best practice

Use setting blocks and gaskets from the approved glazing system

Failure to avoid

Glass edge touching metal / tile / stone

Handover / maintenance

Adjust door pivots / closers when alignment begins to change

Anchors Frames technical drawing
STAGE 03

Anchors Frames

Cut / drill / polish before tempering; laminate / finish as specified

Engineering intent

Prevent glass-to-metal hard contact using setting blocks / gaskets

Inspection / hold point

Frames are plumb, level and securely anchored

Best practice

Protect glass from weld / grinding sparks

Failure to avoid

Drilling or grinding tempered glass on site

Handover / maintenance

Inspect sealants and gaskets for shrinkage / damage

Glazing Setting technical drawing
STAGE 04

Glazing Setting

Set plumb / level frames, channels and anchors

Engineering intent

Finalize before tempering; maintain manufacturer minimum edge distances

Inspection / hold point

Glass has correct setting blocks / clearances

Best practice

Coordinate door hardware with floor / ceiling structure

Failure to avoid

Using incompatible sealant

Handover / maintenance

Do not hang loads or signage on glass without designed fixings

Gaskets Sealants Drainage technical drawing
STAGE 05

Gaskets Sealants Drainage

Install setting blocks, gaskets, glass and hardware without hard contact

Engineering intent

Use compatible structural / weather / sanitary sealant for the application

Inspection / hold point

Door hardware operates smoothly and closes / latches correctly

Best practice

Check sealant compatibility with laminated interlayers and coatings

Failure to avoid

Undersized hardware for heavy doors

Handover / maintenance

Protect edges during adjacent maintenance works

Testing Handover technical drawing
STAGE 06

Testing Handover

Align doors, locks / closers, clean glass and issue care / hardware information

Engineering intent

Plumb / level opening and allow glass installation clearance

Inspection / hold point

Sealant / gaskets are continuous and neat

Best practice

Use templates / jigs for repetitive hardware alignment

Failure to avoid

Allowing construction sparks to permanently pit glazing

Handover / maintenance

Replace cracked / chipped safety glass after specialist assessment

04 · TECHNICAL CHAPTERS

27 detailed sub-activities for Glass & Aluminium.

The file naming and page mapping are one-to-one: each technical subject has its own individual high-resolution image.

Safety Glass
TECHNICAL CHAPTER 01

Safety Glass

Safety Glass: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for safety glass before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass make-up and thickness match approved shop drawings

Failure to avoid

Ordering glass before final opening verification

Maintenance / long-term performance

Clean with non-abrasive products suitable for coatings

Tempered Heat Treated
TECHNICAL CHAPTER 02

Tempered Heat Treated

Tempered Heat Treated: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for tempered heat treated before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Edges / holes / cut-outs are correct and undamaged

Failure to avoid

Glass edge touching metal / tile / stone

Maintenance / long-term performance

Adjust door pivots / closers when alignment begins to change

Laminated Glass
TECHNICAL CHAPTER 03

Laminated Glass

Laminated Glass: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for laminated glass before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Frames are plumb, level and securely anchored

Failure to avoid

Drilling or grinding tempered glass on site

Maintenance / long-term performance

Inspect sealants and gaskets for shrinkage / damage

Insulated Glass Units
TECHNICAL CHAPTER 04

Insulated Glass Units

Insulated Glass Units: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for insulated glass units before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass has correct setting blocks / clearances

Failure to avoid

Using incompatible sealant

Maintenance / long-term performance

Do not hang loads or signage on glass without designed fixings

Low E Solar Control
TECHNICAL CHAPTER 05

Low E Solar Control

Low E Solar Control: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for low e solar control before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Door hardware operates smoothly and closes / latches correctly

Failure to avoid

Undersized hardware for heavy doors

Maintenance / long-term performance

Protect edges during adjacent maintenance works

U-value SHGC
TECHNICAL CHAPTER 06

U-value SHGC

U-value SHGC: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for u-value shgc before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Sealant / gaskets are continuous and neat

Failure to avoid

Allowing construction sparks to permanently pit glazing

Maintenance / long-term performance

Replace cracked / chipped safety glass after specialist assessment

Aluminium Profiles
TECHNICAL CHAPTER 07

Aluminium Profiles

Aluminium Profiles: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for aluminium profiles before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass make-up and thickness match approved shop drawings

Failure to avoid

Ordering glass before final opening verification

Maintenance / long-term performance

Clean with non-abrasive products suitable for coatings

Thermal Break Frames
TECHNICAL CHAPTER 08

Thermal Break Frames

Thermal Break Frames: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for thermal break frames before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Edges / holes / cut-outs are correct and undamaged

Failure to avoid

Glass edge touching metal / tile / stone

Maintenance / long-term performance

Adjust door pivots / closers when alignment begins to change

Curtain Wall
TECHNICAL CHAPTER 09

Curtain Wall

Curtain Wall: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for curtain wall before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Frames are plumb, level and securely anchored

Failure to avoid

Drilling or grinding tempered glass on site

Maintenance / long-term performance

Inspect sealants and gaskets for shrinkage / damage

Shopfronts
TECHNICAL CHAPTER 10

Shopfronts

Shopfronts: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for shopfronts before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass has correct setting blocks / clearances

Failure to avoid

Using incompatible sealant

Maintenance / long-term performance

Do not hang loads or signage on glass without designed fixings

Windows
TECHNICAL CHAPTER 11

Windows

Windows: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for windows before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Door hardware operates smoothly and closes / latches correctly

Failure to avoid

Undersized hardware for heavy doors

Maintenance / long-term performance

Protect edges during adjacent maintenance works

Glazed Doors
TECHNICAL CHAPTER 12

Glazed Doors

Glazed Doors: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for glazed doors before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Sealant / gaskets are continuous and neat

Failure to avoid

Allowing construction sparks to permanently pit glazing

Maintenance / long-term performance

Replace cracked / chipped safety glass after specialist assessment

Frameless Partitions
TECHNICAL CHAPTER 13

Frameless Partitions

Frameless Partitions: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for frameless partitions before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass make-up and thickness match approved shop drawings

Failure to avoid

Ordering glass before final opening verification

Maintenance / long-term performance

Clean with non-abrasive products suitable for coatings

Shower Enclosures
TECHNICAL CHAPTER 14

Shower Enclosures

Shower Enclosures: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for shower enclosures before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Edges / holes / cut-outs are correct and undamaged

Failure to avoid

Glass edge touching metal / tile / stone

Maintenance / long-term performance

Adjust door pivots / closers when alignment begins to change

Balustrades Handrails
TECHNICAL CHAPTER 15

Balustrades Handrails

Balustrades Handrails: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for balustrades handrails before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Frames are plumb, level and securely anchored

Failure to avoid

Drilling or grinding tempered glass on site

Maintenance / long-term performance

Inspect sealants and gaskets for shrinkage / damage

Setting Blocks Clearances
TECHNICAL CHAPTER 16

Setting Blocks Clearances

Setting Blocks Clearances: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for setting blocks clearances before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass has correct setting blocks / clearances

Failure to avoid

Using incompatible sealant

Maintenance / long-term performance

Do not hang loads or signage on glass without designed fixings

Gaskets Weatherseals
TECHNICAL CHAPTER 17

Gaskets Weatherseals

Gaskets Weatherseals: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for gaskets weatherseals before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Door hardware operates smoothly and closes / latches correctly

Failure to avoid

Undersized hardware for heavy doors

Maintenance / long-term performance

Protect edges during adjacent maintenance works

Structural Silicone
TECHNICAL CHAPTER 18

Structural Silicone

Structural Silicone: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for structural silicone before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Sealant / gaskets are continuous and neat

Failure to avoid

Allowing construction sparks to permanently pit glazing

Maintenance / long-term performance

Replace cracked / chipped safety glass after specialist assessment

Weather Sealants
TECHNICAL CHAPTER 19

Weather Sealants

Weather Sealants: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for weather sealants before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass make-up and thickness match approved shop drawings

Failure to avoid

Ordering glass before final opening verification

Maintenance / long-term performance

Clean with non-abrasive products suitable for coatings

Drainage Weep Holes
TECHNICAL CHAPTER 20

Drainage Weep Holes

Drainage Weep Holes: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for drainage weep holes before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Edges / holes / cut-outs are correct and undamaged

Failure to avoid

Glass edge touching metal / tile / stone

Maintenance / long-term performance

Adjust door pivots / closers when alignment begins to change

Anchors Brackets
TECHNICAL CHAPTER 21

Anchors Brackets

Anchors Brackets: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for anchors brackets before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Frames are plumb, level and securely anchored

Failure to avoid

Drilling or grinding tempered glass on site

Maintenance / long-term performance

Inspect sealants and gaskets for shrinkage / damage

Wind Load Deflection
TECHNICAL CHAPTER 22

Wind Load Deflection

Wind Load Deflection: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for wind load deflection before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass has correct setting blocks / clearances

Failure to avoid

Using incompatible sealant

Maintenance / long-term performance

Do not hang loads or signage on glass without designed fixings

Acoustic Glazing
TECHNICAL CHAPTER 23

Acoustic Glazing

Acoustic Glazing: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for acoustic glazing before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Door hardware operates smoothly and closes / latches correctly

Failure to avoid

Undersized hardware for heavy doors

Maintenance / long-term performance

Protect edges during adjacent maintenance works

Fire Rated Glazing
TECHNICAL CHAPTER 24

Fire Rated Glazing

Fire Rated Glazing: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for fire rated glazing before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Sealant / gaskets are continuous and neat

Failure to avoid

Allowing construction sparks to permanently pit glazing

Maintenance / long-term performance

Replace cracked / chipped safety glass after specialist assessment

Aluminium Finishes
TECHNICAL CHAPTER 25

Aluminium Finishes

Aluminium Finishes: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for aluminium finishes before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Glass make-up and thickness match approved shop drawings

Failure to avoid

Ordering glass before final opening verification

Maintenance / long-term performance

Clean with non-abrasive products suitable for coatings

Hardware Fittings
TECHNICAL CHAPTER 26

Hardware Fittings

Hardware Fittings: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for hardware fittings before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Edges / holes / cut-outs are correct and undamaged

Failure to avoid

Glass edge touching metal / tile / stone

Maintenance / long-term performance

Adjust door pivots / closers when alignment begins to change

Site Survey Tolerances
TECHNICAL CHAPTER 27

Site Survey Tolerances

Site Survey Tolerances: Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Design intent

Define the performance and construction intent for site survey tolerances before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate glass make-up, aluminium profiles, wind/thermal/acoustic performance, setting blocks, gaskets, structural/weather seals, anchors, drainage, movement, hardware and testing.

Inspection / QA

Frames are plumb, level and securely anchored

Failure to avoid

Drilling or grinding tempered glass on site

Maintenance / long-term performance

Inspect sealants and gaskets for shrinkage / damage

05 · QA/QC

Inspect before concealment and before handover.

Glass & Aluminium QA QC
01Glass make-up and thickness match approved shop drawings
02Edges / holes / cut-outs are correct and undamaged
03Frames are plumb, level and securely anchored
04Glass has correct setting blocks / clearances
05Door hardware operates smoothly and closes / latches correctly
06Sealant / gaskets are continuous and neat
06 · COMMON FAILURES

Recognise the failure mechanism—not only the visible defect.

Failures to avoid

×Ordering glass before final opening verification

×Glass edge touching metal / tile / stone

×Drilling or grinding tempered glass on site

×Using incompatible sealant

×Undersized hardware for heavy doors

×Allowing construction sparks to permanently pit glazing

Glass & Aluminium common failures
07 · MAINTENANCE & AFTERCARE

Design for access, repair and long-term performance.

Glass & Aluminium maintenance

Maintenance controls

✓Clean with non-abrasive products suitable for coatings

✓Adjust door pivots / closers when alignment begins to change

✓Inspect sealants and gaskets for shrinkage / damage

✓Do not hang loads or signage on glass without designed fixings

✓Protect edges during adjacent maintenance works

✓Replace cracked / chipped safety glass after specialist assessment

08 · STANDARDS & MANUFACTURER REFERENCES

Use the latest approved project documents and tested systems.

• Project structural / safety glazing design requirements

• Relevant EN / ASTM / BS glass standards referenced by specification

• Local authority / building requirements for safety glazing / guards where applicable

• Manufacturer tested hardware load / glass-thickness requirements

• Approved sealants compatible with glass coating / interlayer / frame finish

• Project wind / barrier / impact criteria where applicable

Glass & Aluminium standards and brands
Technical guidance is educational and indicative. Final design, dimensions, materials, installation details and acceptance criteria must follow the approved project documents, manufacturer instructions and the latest requirements of the relevant UAE authority, landlord, consultant and specialist engineer.
09 · COMPLETE IMAGE LIBRARY

40 high-resolution visuals assigned to this activity.

Each file remains separate and is mapped directly to its relevant section. Click any image to inspect it at full resolution.

WA