GLOBALTEK ENGINEERING KNOWLEDGE HUB · ACTIVITY 10

Maintenance & Facilities Management

Facilities management begins at design and handover. Assets need identity, access, baseline condition, maintenance tasks, spares, safe isolation procedures and history so performance can be sustained rather than repeatedly repaired.

36 technical visuals6 execution stages23 technical chaptersQA/QC + failures + maintenance
Maintenance & Facilities Management technical hero
GUIDE MAP

Read the discipline visually, then go into the engineering detail.

Every image below is activity-specific. No repeated generic placeholder sheets are used in this guide.

01 · SYSTEM OVERVIEW

What this activity is

Maintenance & Facilities Management overview drawing

What this activity is

Facilities management combines planned preventive maintenance, statutory inspections, reactive repairs, cleaning, consumables, spare parts, asset management and space / service coordination. For interiors, it also covers finishes, doors, hardware, sealants, joinery and other items often omitted from MEP-only maintenance plans.

What to expect

Expect good maintenance to begin before handover. Assets should be identified, labelled and linked to warranties, manuals, commissioning values, spare parts and access locations. Facilities teams need a planned schedule based on equipment criticality rather than waiting for failure.

01Build an asset register from approved equipment and tagged locations
02Link PPM tasks to manufacturer instructions and statutory requirements
03Record baseline readings at handover
04Prioritise reactive work by safety and operational consequence
05Maintain critical spares and consumables
06Trend recurring faults to remove root causes
02 · ENGINEERING FUNDAMENTALS

Understand why the system behaves the way it does.

01

Availability (%) = operating time / required service time × 100

02

MTBF = operating time / number of failures; MTTR = repair downtime / number of repairs

03

Energy intensity or consumption should be normalised to relevant area/occupancy/operating hours before comparing periods

Maintenance & Facilities Management engineering fundamentals
01

Maintenance access is geometry. Filters, motors, valves, drivers, control panels and access panels require removal paths and working clearance; if these are not designed in, maintenance becomes destructive.

02

PPM frequency should be risk- and manufacturer-based, then adjusted using actual condition and failure history. More frequent is not automatically better.

03

Closeout information has operational value only when it matches the installed asset: model/serial data, warranties, commissioning settings, spares and maintenance tasks should be linked to the asset register.

03 · EXECUTION WORKFLOW

Six progressive stages from preparation to verified handover.

Open any plate to read the full-resolution technical notes.

Asset Identification Register technical drawing
STAGE 01

Asset Identification Register

Build asset list, collect O&M / warranty data and identify maintenance access

Engineering intent

Use unique ID linked to physical label and digital record

Inspection / hold point

Asset register matches physical installation

Best practice

Make asset records usable at the point of maintenance

Failure to avoid

Receiving a project without complete O&M / asset information

Handover / maintenance

Review PPM frequencies annually against failure history and operating conditions

Ppm Planning technical drawing
STAGE 02

Ppm Planning

Verify condition, setpoints and defects at takeover

Engineering intent

Set by risk, duty, environment, statutory requirement and manufacturer guidance

Inspection / hold point

O&M manuals / warranties are available and searchable

Best practice

Prioritise by consequence of failure, not all assets equally

Failure to avoid

Using calendar PPM without considering duty or condition

Handover / maintenance

Keep commissioning baselines to compare performance drift

Reactive Workorder Control technical drawing
STAGE 03

Reactive Workorder Control

Create task frequencies, manpower / specialist needs and consumables

Engineering intent

Hold parts where lead time / downtime consequence justifies inventory

Inspection / hold point

PPM tasks have realistic frequencies and responsible parties

Best practice

Keep filters, strainers, drains and moving hardware on visible routine schedules

Failure to avoid

Closing reactive tickets without root-cause analysis

Handover / maintenance

Maintain sealants, wet-area joints and drainage to prevent hidden water damage

Maintenance Execution technical drawing
STAGE 04

Maintenance Execution

Perform planned tasks, record readings and identify abnormal trends

Engineering intent

Define emergency, urgent, routine and planned categories

Inspection / hold point

Statutory / life-safety inspections are current

Best practice

Use condition trends to intervene before failure where practical

Failure to avoid

Blocking access panels with furniture or later decorative work

Handover / maintenance

Exercise rarely used isolation valves and emergency devices as required

Reporting Compliance technical drawing
STAGE 05

Reporting Compliance

Prioritise faults, protect users / assets and close root cause where practical

Engineering intent

Use temperatures, currents, pressures, alarms or run hours where useful to detect deterioration

Inspection / hold point

Recurring faults have corrective action rather than repeated reset

Best practice

Record modifications in as-built / asset records immediately

Failure to avoid

Using incorrect cleaners on stone, metal, timber or coated surfaces

Handover / maintenance

Inspect joinery hardware, doors and high-use finishes before failures become disruptive

Lifecycle Optimisation technical drawing
STAGE 06

Lifecycle Optimisation

Analyse repeat faults, cost, downtime and condition to adjust strategy

Engineering intent

Record start / expiry and service conditions so maintenance does not invalidate coverage

Inspection / hold point

Access to equipment and isolation points remains clear

Best practice

Coordinate cleaning products with finish manufacturers to avoid damage

Failure to avoid

Failing to update records after equipment replacement or modification

Handover / maintenance

Track energy / water anomalies that can indicate hidden system problems

04 · TECHNICAL CHAPTERS

23 detailed sub-activities for Maintenance & Facilities Management.

The file naming and page mapping are one-to-one: each technical subject has its own individual high-resolution image.

Cafm Asset Register
TECHNICAL CHAPTER 01

Cafm Asset Register

Cafm Asset Register: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for cafm asset register before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Asset register matches physical installation

Failure to avoid

Receiving a project without complete O&M / asset information

Maintenance / long-term performance

Review PPM frequencies annually against failure history and operating conditions

Ppm Planning
TECHNICAL CHAPTER 02

Ppm Planning

Ppm Planning: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for ppm planning before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

O&M manuals / warranties are available and searchable

Failure to avoid

Using calendar PPM without considering duty or condition

Maintenance / long-term performance

Keep commissioning baselines to compare performance drift

Reactive Maintenance Workorders
TECHNICAL CHAPTER 03

Reactive Maintenance Workorders

Reactive Maintenance Workorders: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for reactive maintenance workorders before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

PPM tasks have realistic frequencies and responsible parties

Failure to avoid

Closing reactive tickets without root-cause analysis

Maintenance / long-term performance

Maintain sealants, wet-area joints and drainage to prevent hidden water damage

HVAC Maintenance
TECHNICAL CHAPTER 04

HVAC Maintenance

HVAC Maintenance: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for hvac maintenance before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Statutory / life-safety inspections are current

Failure to avoid

Blocking access panels with furniture or later decorative work

Maintenance / long-term performance

Exercise rarely used isolation valves and emergency devices as required

Electrical Maintenance
TECHNICAL CHAPTER 05

Electrical Maintenance

Electrical Maintenance: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for electrical maintenance before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Recurring faults have corrective action rather than repeated reset

Failure to avoid

Using incorrect cleaners on stone, metal, timber or coated surfaces

Maintenance / long-term performance

Inspect joinery hardware, doors and high-use finishes before failures become disruptive

Plumbing Drainage Maintenance
TECHNICAL CHAPTER 06

Plumbing Drainage Maintenance

Plumbing Drainage Maintenance: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for plumbing drainage maintenance before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Access to equipment and isolation points remains clear

Failure to avoid

Failing to update records after equipment replacement or modification

Maintenance / long-term performance

Track energy / water anomalies that can indicate hidden system problems

Fire Life Safety Maintenance
TECHNICAL CHAPTER 07

Fire Life Safety Maintenance

Fire Life Safety Maintenance: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for fire life safety maintenance before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Asset register matches physical installation

Failure to avoid

Receiving a project without complete O&M / asset information

Maintenance / long-term performance

Review PPM frequencies annually against failure history and operating conditions

BMS Smart Systems
TECHNICAL CHAPTER 08

BMS Smart Systems

BMS Smart Systems: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for bms smart systems before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

O&M manuals / warranties are available and searchable

Failure to avoid

Using calendar PPM without considering duty or condition

Maintenance / long-term performance

Keep commissioning baselines to compare performance drift

Lifts Escalators
TECHNICAL CHAPTER 09

Lifts Escalators

Lifts Escalators: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for lifts escalators before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

PPM tasks have realistic frequencies and responsible parties

Failure to avoid

Closing reactive tickets without root-cause analysis

Maintenance / long-term performance

Maintain sealants, wet-area joints and drainage to prevent hidden water damage

Civil Structural Fabric
TECHNICAL CHAPTER 10

Civil Structural Fabric

Civil Structural Fabric: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for civil structural fabric before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Statutory / life-safety inspections are current

Failure to avoid

Blocking access panels with furniture or later decorative work

Maintenance / long-term performance

Exercise rarely used isolation valves and emergency devices as required

Joinery Doors Ffande
TECHNICAL CHAPTER 11

Joinery Doors Ffande

Joinery Doors Ffande: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for joinery doors ffande before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Recurring faults have corrective action rather than repeated reset

Failure to avoid

Using incorrect cleaners on stone, metal, timber or coated surfaces

Maintenance / long-term performance

Inspect joinery hardware, doors and high-use finishes before failures become disruptive

Cleaning Hygiene
TECHNICAL CHAPTER 12

Cleaning Hygiene

Cleaning Hygiene: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for cleaning hygiene before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Access to equipment and isolation points remains clear

Failure to avoid

Failing to update records after equipment replacement or modification

Maintenance / long-term performance

Track energy / water anomalies that can indicate hidden system problems

Pest Control
TECHNICAL CHAPTER 13

Pest Control

Pest Control: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for pest control before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Asset register matches physical installation

Failure to avoid

Receiving a project without complete O&M / asset information

Maintenance / long-term performance

Review PPM frequencies annually against failure history and operating conditions

Energy Water Management
TECHNICAL CHAPTER 14

Energy Water Management

Energy Water Management: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for energy water management before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

O&M manuals / warranties are available and searchable

Failure to avoid

Using calendar PPM without considering duty or condition

Maintenance / long-term performance

Keep commissioning baselines to compare performance drift

Indoor Air Quality
TECHNICAL CHAPTER 15

Indoor Air Quality

Indoor Air Quality: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for indoor air quality before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

PPM tasks have realistic frequencies and responsible parties

Failure to avoid

Closing reactive tickets without root-cause analysis

Maintenance / long-term performance

Maintain sealants, wet-area joints and drainage to prevent hidden water damage

Waste Recycling
TECHNICAL CHAPTER 16

Waste Recycling

Waste Recycling: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for waste recycling before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Statutory / life-safety inspections are current

Failure to avoid

Blocking access panels with furniture or later decorative work

Maintenance / long-term performance

Exercise rarely used isolation valves and emergency devices as required

Sla Kpi Reporting
TECHNICAL CHAPTER 17

Sla Kpi Reporting

Sla Kpi Reporting: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for sla kpi reporting before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Recurring faults have corrective action rather than repeated reset

Failure to avoid

Using incorrect cleaners on stone, metal, timber or coated surfaces

Maintenance / long-term performance

Inspect joinery hardware, doors and high-use finishes before failures become disruptive

Spares Inventory
TECHNICAL CHAPTER 18

Spares Inventory

Spares Inventory: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for spares inventory before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Access to equipment and isolation points remains clear

Failure to avoid

Failing to update records after equipment replacement or modification

Maintenance / long-term performance

Track energy / water anomalies that can indicate hidden system problems

Permit Shutdown Loto
TECHNICAL CHAPTER 19

Permit Shutdown Loto

Permit Shutdown Loto: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for permit shutdown loto before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Asset register matches physical installation

Failure to avoid

Receiving a project without complete O&M / asset information

Maintenance / long-term performance

Review PPM frequencies annually against failure history and operating conditions

Vendor Amc Management
TECHNICAL CHAPTER 20

Vendor Amc Management

Vendor Amc Management: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for vendor amc management before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

O&M manuals / warranties are available and searchable

Failure to avoid

Using calendar PPM without considering duty or condition

Maintenance / long-term performance

Keep commissioning baselines to compare performance drift

Condition Lifecycle Planning
TECHNICAL CHAPTER 21

Condition Lifecycle Planning

Condition Lifecycle Planning: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for condition lifecycle planning before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

PPM tasks have realistic frequencies and responsible parties

Failure to avoid

Closing reactive tickets without root-cause analysis

Maintenance / long-term performance

Maintain sealants, wet-area joints and drainage to prevent hidden water damage

Emergency Response
TECHNICAL CHAPTER 22

Emergency Response

Emergency Response: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for emergency response before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Statutory / life-safety inspections are current

Failure to avoid

Blocking access panels with furniture or later decorative work

Maintenance / long-term performance

Exercise rarely used isolation valves and emergency devices as required

Project to Fm Handover
TECHNICAL CHAPTER 23

Project to Fm Handover

Project to Fm Handover: Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Design intent

Define the performance and construction intent for project to fm handover before fabrication or installation. Read the drawing together with the approved project specification, manufacturer data and adjoining details.

Coordination

Coordinate asset registers, access, planned preventive maintenance, statutory inspections, spares, condition monitoring, response priorities, lifecycle renewal and service records.

Inspection / QA

Recurring faults have corrective action rather than repeated reset

Failure to avoid

Using incorrect cleaners on stone, metal, timber or coated surfaces

Maintenance / long-term performance

Inspect joinery hardware, doors and high-use finishes before failures become disruptive

05 · QA/QC

Inspect before concealment and before handover.

Maintenance & Facilities Management QA QC
01Asset register matches physical installation
02O&M manuals / warranties are available and searchable
03PPM tasks have realistic frequencies and responsible parties
04Statutory / life-safety inspections are current
05Recurring faults have corrective action rather than repeated reset
06Access to equipment and isolation points remains clear
06 · COMMON FAILURES

Recognise the failure mechanism—not only the visible defect.

Failures to avoid

×Receiving a project without complete O&M / asset information

×Using calendar PPM without considering duty or condition

×Closing reactive tickets without root-cause analysis

×Blocking access panels with furniture or later decorative work

×Using incorrect cleaners on stone, metal, timber or coated surfaces

×Failing to update records after equipment replacement or modification

Maintenance & Facilities Management common failures
07 · MAINTENANCE & AFTERCARE

Design for access, repair and long-term performance.

Maintenance & Facilities Management maintenance

Maintenance controls

✓Review PPM frequencies annually against failure history and operating conditions

✓Keep commissioning baselines to compare performance drift

✓Maintain sealants, wet-area joints and drainage to prevent hidden water damage

✓Exercise rarely used isolation valves and emergency devices as required

✓Inspect joinery hardware, doors and high-use finishes before failures become disruptive

✓Track energy / water anomalies that can indicate hidden system problems

08 · STANDARDS & MANUFACTURER REFERENCES

Use the latest approved project documents and tested systems.

• Manufacturer O&M manuals and warranty conditions

• Current statutory / authority maintenance and inspection requirements

• SFG20 or other maintenance task libraries only where adopted by the client / FM contract

• Commissioning records and design setpoints

• Client service-level agreements and asset criticality framework

• Safe systems of work, permit-to-work and access requirements

Maintenance & Facilities Management standards and brands
Technical guidance is educational and indicative. Final design, dimensions, materials, installation details and acceptance criteria must follow the approved project documents, manufacturer instructions and the latest requirements of the relevant UAE authority, landlord, consultant and specialist engineer.